Details the relationship between the Alabama Dept. of transportation (ALDOT) and public utilites desiring to place electric lines, water and sewer lines and other public utilities on ALDOT rights-of-way
The primary goal of the Alabama Statewide Airport System Plan (SASP) was to develop a recommended aviation system to meet the needs of Alabama’s flying public and to meet statewide economic development objectives.